Posted in:

Natural Gas Pipeline Work Begins in Newport

Piedmont Natural Gas workers perform pipeline maintenance. Photo: Contributed

Piedmont Natural Gas is performing routine natural gas pipeline maintenance this week in Newport.

The subsidiary of Duke Energy said the safety and reliability work began Monday near 5871 U.S. 70 and will continue through Tuesday, but bad weather could affect the project timetable.

Operations include the use of a flare stack, or large vertical pipe, which could produce a loud noise and result in a tall flame being visible to nearby neighborhoods and businesses. People in the area also may notice a whistling sound or the smell of natural gas.

Flare stack operation is a controlled process that will be managed and monitored by Piedmont Natural Gas personnel in cooperation with local fire department resources.

A a flare stack. Photo: Contributed

About the Author

Staff Report

The story was compiled by staff members of Coastal Review Online.